|
|
STEEL THREADED HEXAGON BUSHING, H.P. 1-1/2 x 1/2
|
(2009-8) |
PC |
4,140
|
|
|
STEEL THREADED HEXAGON BUSHING, H.P. 1-1/2 x 3/4
|
(2009-8) |
PC |
4,140
|
|
|
STEEL THREADED HEXAGON BUSHING, H.P. 1-1/2 x 1
|
(2015-11) |
PC |
4,485
|
|
|
STEEL THREADED HEXAGON BUSHING, H.P. 1-1/2 x 1-1/4
|
Yujin (2020-9) |
PC |
4,485
|
|
|
STEEL THREADED HEXAGON BUSHING, H.P. 2 x 3/4
|
(2009-8) |
PC |
6,210
|
|
|
STEEL THREADED HEXAGON BUSHING, H.P. 2 x 1
|
|
PC |
|
|
|
STEEL THREADED HEXAGON BUSHING, H.P. 2 x 1-1/4
|
(2009-3) |
PC |
6,210
|
|
|
STEEL THREADED HEXAGON BUSHING, H.P. 2 x 1-1/2
|
(2015-11) |
PC |
6,555
|
|
|
STEEL THREADED HEXAGON BUSHING, H.P. 2-1/2 x 2
|
|
PC |
|
|
|
STEEL THREADED HEXAGON BUSHING, H.P. 3 x 2-1/2
|
|
PC |
|
|
|
STEEL THREADED UNION, H.P. 1/8
|
(2009-7) |
PC |
8,050
|
|
|
STEEL THREADED UNION, H.P. 1/4
|
Yujin (2018-4) |
PC |
5,635
|
|
|
STEEL THREADED UNION, H.P. 3/8
|
Yujin (2018-4) |
PC |
5,635
|
|
|
STEEL THREADED UNION, H.P. 1/2
|
Yujin (2018-4) |
PC |
5,635
|
|
|
STEEL THREADED UNION, H.P. 3/4
|
Yujin (2018-4) |
PC |
7,590
|
|
|
STEEL THREADED UNION, H.P. 1
|
(2015-11) |
PC |
11,500
|
|
|
STEEL THREADED UNION, H.P. 1-1/4
|
(2015-11) |
PC |
20,700
|
|
|
STEEL THREADED UNION, H.P. 1-1/2
|
(2015-11) |
PC |
25,300
|
|
|
STEEL THREADED UNION, H.P. 2
|
(2015-11) |
PC |
32,200
|
|
|
STEEL THREADED UNION, H.P. 2-1/2
|
|
PC |
|
|
|
STEEL THREADED UNION, H.P. 3
|
|
PC |
|
|
|
STEEL THREADED SOCKET, H.P. 1/8
|
Yujin (2017-3) |
PC |
575
|
|
|
STEEL THREADED SOCKET, H.P. 1/4
|
Yujin (2019-1) |
PC |
575
|
|
|
STEEL THREADED SOCKET, H.P. 3/8
|
Yujin (2019-1) |
PC |
805
|
|
|
STEEL THREADED SOCKET, H.P. 1/2
|
Yujin (2019-1) |
PC |
1,150
|
|
|
STEEL THREADED SOCKET, H.P. 3/4
|
Yujin (2019-1) |
PC |
1,955
|
|
|
STEEL THREADED SOCKET, H.P. 1
|
(2016-10) |
PC |
3,450
|
|
|
STEEL THREADED SOCKET, H.P. 1-1/4
|
(2015-11) |
PC |
5,750
|
|
|
STEEL THREADED SOCKET, H.P. 1-1/2
|
(2015-11) |
PC |
7,130
|
|
|
STEEL THREADED SOCKET, H.P. 2
|
(2015-11) |
PC |
12,075
|
|
|